Achieved Last Week
At the Football Pavilion we fitted replacement vent grills on the back, cleared more soil etc from gully at back, and cleared the front roadway of leaves and mud. We filled the depressions in the play area at the Rec. At the Memorial Hall we cleared all the gutters and down pipes and checked the automatic light switches. We did siding out down Hitchin Lane and some of the High Street to Church Lane and also cleared the Ron Hyde bus stop of mud and leaves. We looked at the door closer at the school and found it needs some screwing which JonM has done in overtime. Keith finished the school playground clearing in overtime.
0 Comments
|
AuthorBob Finch. Archives
December 2021
Categories |