Progress Wed 16th Aug
Autumn Show Banners & Signs fixed Allotment water meter reading checked for Carina Murph stuck back small section of black pvc skirting near kitchen door Bench team stained 2 benches at Memorial Hall Bark raked in Rec Play area Bonfire heap turned over ready for next week Jon & Gordon found fault on Dacre Rooms electric cooker & sourced replacement part on internet David took home a stool from the Church for woodworm treatment Progress Wed 2nd August 2017 Tasks completed by a small elite band: Bench outside Corner Stores painted 2nd coat varnish to Flower Stands Gloss coat to top windows of Church House continued (rain stopped play before completion) Roof space above store in Church House inspected. (no sign of water penetration) Trap door in ceiling of store re-fixed Carpet patched in hall of Church House Bushes at back & side of Church house car park cut back & debris taken to bonfire patch Progress July 26th An amazing amount done despite the weather forecast. We fitted the corner protectors in the Green Room corridor, cut both the Eastern and Western hedges and removed the arisings, we cleared much of the perimeter and paths of sidings, and varnished the flower stands in the church, PAT tested the equipment in Church House (except that Jon had already done it but had forgotten - they did find an appliance that had not been done though - so not all lost). Later I went and secured the Peters Green toilet door so it could not be used (rotten floor). During the last week Jon and David fixed the broken Dacre Rooms clock.
0 Comments
Leave a Reply. |
AuthorBob Finch. Archives
December 2021
Categories |